Architecture Interior Design Print Blueprint Drawing
Viewer Controls
- Rotate: Left-click + drag
- Pan: Right-click + drag
- Zoom: Scroll wheel
- Rotate: Swipe
- Zoom: Pinch to Zoom
Framed Prints From imageBROKER
This artwork is available as
Framed Print of Architecture interior Man Creative project plan designer home
Architecture interior Man Creative project plan designer home and Choose interior materials drawing interior on blueprint. Explore the World Through imageBROKER Prints. © imageBROKER/Sirijit Jongcharoenkulchai
Artwork Licensed From imageBROKER (imageBROKER.com/16997402)
Your chosen combination is quickly and professionally made to order - Shipping & Delivery Details
If you are not entirely happy with your items, simply return them to us within 30 days for a replacement or full refund - 30 Day Returns
Media ID 51563734
Premium A1 (A2 Poster)
Ready to Hang Contemporary Framed Prints adds style, protection, and a polished touch to your space - effortlessly.
Your artwork will be printed as shown in the preview. To adjust please select Edit Printed Image under the Buy button
Premium Paradise Wooden Range A1 Premium Poster Frame (86x62cm) with A2 Poster (59x42cm) and mounted behind a white matt board to make your photo really stand out. FSC Certified and Rainforest Alliance Certified for environmental, social, and economic sustainably. High transparency tempered glass window with a smooth finished frame. Great for filling empty walls, decorating blank spaces, or creating eye-catching gallery walls. Frames arrive ready to hang. Sent with secure, protective packaging. Smooth wooden veneer mimics the real wood look and feel with ultra-durable scratch resistance tempered glass. Note: measurements provided are estimated outer dimensions, which include both the image and the frame. While we aim to keep sizing consistent, exact dimensions may vary slightly due to differences in print size or production requirements, which may result in a variation in the overall size (up to approximately 2.5cm (1"))
These are individually made so all sizes are approximate
Estimated Image Size (if not cropped) is 58.8cm x 41.4cm (23.1" x 16.3")
Estimated Product Size is 86.6cm x 62cm (34.1" x 24.4")





